SELECT COMPLETED PROJECTS

Walter Hardman Dam Safety Investigation 

Duration: March 2017 - November 2018 

Project: SEC was hired by BC Hydro Dam Safety to deliver a dam safety investigation project at the Walter Hardman dam.  The Project was carried out over 2 years, 2017 and 2018, in order to gather the required information for the Dam Safety Review. 

Services:  Procurement, site safety coordination, developed the master schedule, organised and led the pre-job meeting, ensured safety and environmental compliance, monitored variances in budget, schedule and scope and created a comprehensive completion report.

Foundation Drain Inspection Peace Canyon Dam

Duration: March 2018 - November 2018 

Project: SEC was hired by BC Hydro Generations to deliver a foundation drain inspection project at the Peace Canyon dam.  The Project will be followed by a drain cleaning project in 2019. 

 

 

Services:  Procurement, site safety coordination, developed the master schedule, organized and led the pre-job meeting, ensured safety and environmental compliance, monitored variances in the budget, schedule and scope and created a comprehensive completion report.

Peace Canyon Dam Parking Lot Repaving 

Duration: March 2017 - June 2018 

Project: SEC was hired by BC Hydro Generation to deliver a Parking Lot Repaving project. It was identified that water pooling in the parking lot was causing a seasonal safety issue. 

Services:  Procurement, developed the master schedule, organised and led the pre-job meeting, ensured safety and environmental compliance, monitored variances in budget, schedule and scope and created a comprehensive completion report.

Strathcona Flume Concrete Repair Work

Duration: January 2017 - July 2018 

Project: SEC was hired  to deliver a concrete repair work project on the Hallow-Cone Valve Concrete flume at the Strathcona Dam. The project included cast in place concrete and to lay new rebar where there were damaged or lost sections,

Services:  Created project scope documentation, Procured and monitored contractor, Created master construction schedule and created a comprehensive completion report. 

Storm Water Management Plan

Duration: January 2018 - May 2018 

Project: SEC was hired to prepare an Environmental Management Plan for the long-term management of seasonal storm water Run-off at an Asphalt Plant.

Services:  Created project scope documentation, insured all associated legal documentation was reviewed and applied, created a long-time scheduled for water quality sampling, and organized lab analysis of samples.

Seven Mile Dam Road Realignment

Duration: May 2015 - November 2017 

Project: Provide a project solution to ensure safe passage for vehicles traveling along the Seven Mile Dam Access road.  The included a geotechincal investigation, road rehabilitation design and executing the desing.

Services:  Procured and monitored consultants and constuction contractor, provided on site construction management, facilitated the aquisition of all safety permits, provided safety and environmental reccomondations, created master construction schedule and created a comprehensive completion report. 

Strathcona Rock Scaling

Duration: June 2017 - November 2017 

Project: During a maintenance inspection unstable rock above the Strathcona Dam was identified. SEC managed the project to remove the loose rocks and inspect the rock face.

Services:  Created project scope documentation, procured and monitored contractor, created master construction schedule and created a comprehensive completion report. 

Jordan River Road Rehabilitation 

Duration: January 2017 - October 2017 

Project: Over time the Jordan River road becomes over grown with vegetaion and difficult to drive due to ersion. The purpose of the project was to rehabilitate the Jordan River road. 

Services:  Created project scope documentation, procured and monitored contractor, created master construction schedule and created a comprehensive completion report. 

G.M. Shrum Generating Station Drainage Adit Access Repairs​

Duration: March 2017 - November 2017 

Project: Manage the trash rack cleaning project a Mica Dam. The scope included assembling a barge for the crane to situate itself near the trash rack, real-time acoustic surveying to guide the crane operator and debris disposal

Services:  Created project scope documentation, procured and monitored consultants and contractors, created master construction schedule, provide site safety coordination and created a comprehensive completion report. 

Mica Dam U1 Trash Rack Cleaning

Duration: February 2016 - May 2017 

Project: Manage the trash rack cleaning project a Mica Dam. The scope included assembling a barge for the crane to situate itself near the trash rack, real-time acousticsurveying to guide the crane operator and debris disposal

Services:  Created project scope documentation, procured and monitored consultants and contractors, created master construction schedule, provide site safety coordination and created a comprehensive completion report. 

Quinsam River Diverion Canal Joint and Concrete Reparis

Duration: March 2017 - September 2018 

Project: The Quinsam river diversion canal required expansion joint and spot concrete repairs along the whole diversion canal, ~1km.  

Services:  Created project scope documentation, help determin the best long-term solution for the expansion join repairs, procured and monitored contractor, created master construction schedule and created a comprehensive completion report. 

Overhead Crane Training and Authorization Program

Duration: February 2016 - September 2018 

Project: Implement a WorkSafe compliant fixed crane operator training program. 

Services:  Created project scope documentation, assemble a technical user group, procured and monitored training consultant, created master training rollout schedule. led a one day training curriculum workshop and completed a rollout presentation to each generation station. 

Wahleach Dam Crest Road and LockBlock Rehabilitation

Duration: March 2017 - September 2018 

Project: Over time the Wahleach Dam crest road and lock blocks required rehabilitation and repairs. The goal of the project was to rehability the road and lock blocks to the original design. 

Services:  Created project scope documentation, help determin the best long-term solution for the expansion join repairs, procured and monitored contractor, created master construction schedule and created a comprehensive completion report. 

Elko Dam Public Warning System

Duration: May 2014 - March 2016 

Project:  BC Hydro hired SEC to plan and install a public warning system at the Elko Dam. 

Services:  Scope development, held public engagement meeting, developed construction schedule, monitored design and installation work and provided a comprehensive completion report.

Aberfeldie Dam Intakes Dredge

Duration: January 2014 - September 2015. May - June 2019.

Project: BC Hydro dredges the Aberfeldie Dam headpond regularly to ensure flow into their generator intakes. In June 2014, BC Hydro undertook a larger dredge to remove sediment from the ABN headpond. Sediment removal occurred again in 2019.

Services:  Prepared reports for DFO, obtained environmental approvals, provided on site project management, procured contractors and helped monitor budget, scope and schedule. 

Revelstoke, Spill Response,  Environmental Monitoring, Erosion and Sediment control, Electrofishing, Project management, Civil maintenance, Road construction, Pre construction and post-construction monitoring, Environmental Protection Plans (EPPs) and Environmental Management Plans (EMPs), Compliance testing for land, air and water systems, Water quality monitoring, Wildlife presence absence and monitoring studies, Species at risk (SAR) protection plans,  Terrestrial and aquatic inventories, Bird presence/absence surveys, nest and bird inventories, nest sweeps, Land impact mitigation and compensation plans, Habitat compensation design, Fish Identification, Wetland Habitat, Creation of wildlife harm reduction programs, Invasive species identification and removal, Environmental Impact Assessments (EIA) and Environmental Overview Assessments (EOA),  Environmental Permitting Applications - regulatory submissions and process management, Environmental Avoidance, Prevention and Impact Mitigation Strategies, Riparian Areas Regulation (RAR) Assessments, Phase 1 Preliminary Site Investigations, Technical correspondence, Professional presentations, Public presentations, River surveying with SEC cataraft, Fish population and fish habitat inventories, Aquatic salvages, Taxonomic ID of fish and benthic invertebrates, Design and construction of fish habitat, Statistical analysis, , Training for spill response and hazardous waste management, Impact assessment for spill response, Environmental impact evaluation, Environmental emergency spill response, Emergency spill response coordination, Oil spill sensitivity mapping, Clean-up, remediation, and revegetation of spills and contaminants, Detailed Site Assessments (DSA) for reclamation certificates,  Water, land and soil sampling, Asbestos bulk sampling (building materials)​, Lead in paint and water sampling, Lead Content Water Management, Abatement Risk Assessment